Home Extension Costs in 2026: What You Will Actually Pay

Every extension conversation starts with a number and ends with a bigger one. Between the first sketch and the final invoice sits a chain of costs that builders rarely volunteer: planning fees, structural calculations, party wall awards, building control inspections and the kitchen you inevitably upgrade halfway through. This guide separates the costs you can budget from the ones that ambush you.
What a square metre costs in 2026
Build cost is the largest line and the easiest to misjudge. A straightforward single-storey rear extension with a pitched roof and standard windows currently runs about $2,400 to $2,900 per square metre. Add large sliding doors, a flat roof with a lantern, or a kitchen fit-out and the figure climbs toward $3,400 to $3,800.
Two-storey extensions cost less per square metre on paper because the roof and foundations are shared, but they carry more structural work and scaffolding. Budget $2,200 to $2,600 per square metre for the shell, then add the first-floor bathroom or bedroom fit-out separately.

A 20-square-metre rear extension therefore lands somewhere between $48,000 and $76,000 before fees. That range is wide because the specification is wide. The cheapest quote will usually exclude the glazing, the floor finish and the making-good of the existing wall, which is where the difference reappears.
Room-by-room budget ranges
Our sample budgets assume a mid-range specification, a competent main contractor and reasonable site access. They include the shell, glazing, basic electrics and flooring, but not kitchens or bathrooms.
Rear kitchen extension, 20 square metres
Expect $55,000 to $75,000 for the build. A structural opening to the existing house, a steel beam and a three-panel slider account for much of the variance. If the garden slopes or drainage runs under the footprint, add $4,000 to $9,000.
Side-return extension, 12 square metres
Narrow side returns look cheap and rarely are. Access is tight, foundations often need piling, and the party wall agreement is almost unavoidable. Budget $38,000 to $52,000, plus $1,500 to $3,000 for the award.

Two-storey extension, 30 square metres
The shell costs around $70,000 to $85,000. Finishing the upstairs bedroom and bathroom pushes the total to $110,000 or more. The advantage is that you gain space twice for one set of foundations and one scaffold.
Garage conversion, 18 square metres
The cheapest way to add habitable space: $22,000 to $38,000 depending on whether the floor needs lowering, the walls need insulating and the roof needs replacing. It rarely adds the same resale value as a true extension, but it is fast and less disruptive.
The fees nobody quotes first
Build cost is only part of the invoice. Architects charge 6 to 12 percent of the project value for full services, or a fixed $3,000 to $8,000 for drawings and a planning application. Structural engineers charge $600 to $1,800 for beam calculations and foundation design. Planning application fees sit around $300 for a householder application, and building control adds another $500 to $900.
Then come the site-specific costs: a party wall award at $1,500 to $3,000, a drainage survey at $400 to $800, and temporary kitchen arrangements while the back of the house is open to the weather. Add 8 to 12 percent of the build cost for this whole layer and you will not be far off.

Why the contingency matters
Older houses hide things. A wall that should be brick turns out to be rubble. The drain runs exactly where the new foundation needs to go. The electrics date from a previous renovation and fail inspection the week the plasterer arrives.
Five percent contingency is a marketing number. Ten percent is realistic, and fifteen percent is sensible for a pre-1950 property that has not been touched in decades. On a $70,000 build that means holding back $7,000 to $10,500 you hope never to spend.
"The cheapest quote is rarely the cheapest job. It is usually the one with the most assumptions left unwritten."
How to keep the budget under control
Fix the specification before you request quotes. Every “we can decide later” becomes a variation, and variations are priced at the contractor's convenience rather than yours. Choose glazing, flooring and kitchen units early, in writing, with model numbers.
Ask for a quote broken into work packages rather than one lump sum. You can then compare labour rates and see whether the groundworks or the glazing is driving the price. Pay in stages against completed work, never in advance for materials you have not seen delivered.
If the budget is tight, cut finishes before you cut structure. A cheaper kitchen can be replaced in five years; shallow foundations cannot. For more on what actually returns value, read which renovations raise your home's value.
Timeline and disruption
Planning typically takes 8 to 10 weeks, building regulations another 4 to 6, and the build itself 12 to 20 weeks depending on weather and complexity. Expect the house to be dusty, loud and cold for at least three months.
Set up a temporary kitchen, move fragile items away from the work zone, and agree working hours with neighbours before the first skip arrives. Goodwill is cheaper than a complaint. If you are also rethinking the interior layout, our space optimization guide covers the furniture decisions that come after the builders leave.

The bottom line
A well-run extension costs more than the brochures suggest and less than a move to a bigger house. Budget $2,400 to $3,800 per square metre for the build, add a tenth for fees and a tenth for surprises, and fix every finish before signing. Do that and the room you get will be the room you planned.